Triaster Process Map Stencil
Process maps are constructed in Visio from the basic shapes available in the Stencil.
Process Navigator is supplied with a stencil with a default set of shapes.
The list below are these default shapes, though your organisation may use a similar, but customised set of shapes.
Shape |
Definition |
 |
Activities are things you do. They use and produce Deliverables. |
 |
Used to show an Activity that is performed outside the organisation. Often used when the Activity is brief and the Output Deliverable returns immediately back to the organisation. |
 |
Decisions are things you do. Decisions are special types of Activity where, typically, only one of the outputs is produced. |
 |
Deliverables are things you produce or use. Internal Deliverables are produced or consumed within the organisation. |
 |
External Deliverables are things produced or consumed outside the organisation or outside the scope of the processes that are being mapped. |
 |
Handover Deliverables are internal deliverables produced or consumed outside the scope of the department being mapped. |
 |
Start/End Deliverables are internal deliverables that end a process. Often used to designate an Archive. |
 |
Page border used to display Node level information. Nodes are logically equivalent to Activities. They are used as containers for expanded views of their associated Activities. |
 |
Background for the process maps. |
 |
A small hyperlink button sized to fit next to an activity to which a hyperlink can be inserted and icon changed. |
 |
A hyperlink button specifically designed to link to further information stored in an external document. |
 |
Sends an email to a predefined address. |
 |
Shape for providing buttons on Menu Pages. |
 |
Transparent box into which text can be added. Often used during drafting the maps to provide information to a reviewer and then deleted before pubishing. |
|
Resizable and movable swimlanes. Can be horizontal or vertical. |
|